1- Investor:
The HCM City Service of Communications and Public Works 63 Ly Tu Trong Street, District 1 HCM City, Vietnam Tel: 84-8-829 0451 or 823 7439 Fax: 84-8-829 0458
2- Size and technical requirements:
- Project’s life span: 100 years - Design speed: 80km/h - Loading capacity: loading design HL 93 - Number of lanes: 4 lanes, 3.5 meter-wide each. - 1 or 2 lanes in each exit of the road upon demand - Length: 8.2 km + Beginning point: Lang Cha Ca roundabout + Ending point: Nguyen Huu Canh St (next to Thi Nghe II Bridge) - Bridge design must be slim, esthetic and well intergrated in the landscape. - Routing can follow the course of Nhieu Loc – Thi Nghe canal or different if proven as being more appropriate and feasible .
3- Investment Capital: 3,500 billion VNĐ est. (project in category A):
- Construction cost: 2,200 billion VNĐ - Resettlement cost: 1,300 billion VNĐ
4- Time frame:
- Project studies start in Aug, 2006 and bridge commissioned by 2010 - Priority to investors experienced in elevated road construction and proposing better and shorter time frame.
5- Construction technologies:
Contractors might use cantilever erection method or propose other modern technologies more environment friendly and less traffic disrupting.
6- Investment form: BOT
7- Incentive policy:
The City’s authorities will facilitate the land clearance and population resettlement process (The City might consider to carrying out the process on its own) |